Blog
-
v26.16 | Videos in the Timeline Block, Security Improvements, New Ideas Open for Voting, Bug Fixes and More!
Again time for some accessibility improvements on Planet4! Also the option to add videos in the newly designed Timeline Block, better security and bug fixes.
-
Report: 2026-06 PHP runtime error and outage on a subset of production sites
Initial problemWe noticed that there was a version mismatch in a php library. Since it’s a dependency of a dependency, we didn’t have a specific version defined in our composer…
-
Resistance Hub: From agency dependence to in-house innovation
Campaign goals matter, but so does how we get there. Building on existing tools strengthens the entire network.
-
Case Study, Writing Guide
Writing a case study involves telling a compelling story about a particular situation, problem, or project, and how it was addressed. Here's a guide to help you get started.
Filter posts
Filtered results
-
P4 Annual Community Survey Report 2022
Welcome to the P4 Survey Report 2022!
-
Building an Email To Target (ETT) form in P4 with Gravity Forms in Greenpeace Switzerland 🇨🇭
How we built an ETT Campaign using the P4 Form builder
-
Building a “Deep sea quiz” in P4 with Gravity Forms in Greenpeace Belgium 🇧🇪
How we built a “which deep sea creature are you” quiz for a lead collection campaign
-
Building 2 forms with Gravity Forms and connecting them to Marketing Cloud in Greenpeace Aotearoa 🇳🇿
How we built a volunteer collection and a petition form using the P4 Form builder and connected them to our Marketing Cloud instance
-
Building a Quiz in P4 with Gravity Forms in Greenpeace Greece 🇬🇷
How we built a koala-themed quiz using the P4 Form Builder
-
Building a petition in P4 with Gravity Forms in Greenpeace Brasil 🇧🇷
A video recap of our experience in creating a petition using the new form builder!
-
How Greenpeace Brasil piloted the new P4 Information Architecture 🇧🇷
We just launched the first P4 site using the new blocks and patterns, here's how it all happened.
-
How does Netherlands implement Hotjar into their engagement and fundraising strategy?
Netherlands office has an integrated and thorough approach when using Hotjar to help with adapting their Engagement and Fundraising strategies.
-
Moving P4 from weekly releases to Continuous Delivery – Pros, cons and comms
Switching Planet 4 deployments to Continuous Delivery - Communication and Development Flows
-
How to use Hotjar to test assumptions and to find bugs – Switzerland case study
Greenpeace Switzerland case study on using Hotjar Incoming Feedback and Polls.












